The master schedule for producing these two items for the next six weeks is shown below. ![]() Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't shipped immediately. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. In fact, Space Age carries no finished-goods inventory. Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. Coral wonders what can be done to alleviate this problem. Skilled machinists with Ed's experience and employment record are extremely difficult to find. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. However, due to the workload for producing part 3079, it has been necessary to schedule frequent overtime for him in order to finish the necessary parts on time.Ĭoral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappy about so much overtime. At present, Ed works a regular 40-hour week. ![]() However, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. Once set up and started, the lathe can run nearly unattended. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age's shop. 3079) that requires machining on a special lathe used only for making that part. However, two of these products-the Saturn microwave stand and the Gemini TV stand-have a part (no. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. ![]() The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |